
The
United Nations House
in Maseru - Lesotho |
|
Contact UNDP Lesotho Newsroom |
For more Inquiries
Phone: (+266) 22 313 790
E-mail:
mpho.sesoane@undp.org
Fax: (+266) 22 310 042 |
|
| |
|
|
| |
| |
| |
| |
|
|
Technical Specifications
for Free-Standing Portal Frame(Knock-Down) |
|
|
|
|
UNITED NATIONS DEVELOPMENT PROGRAMME LESOTHO
Technical Specifications |
Click here to get the list of the
sites where the tents are going to be installed.
|
1. |
Base Plate: |
(a)
250 x 250 x 8mm thick four times holed for 12mm diameter bolts.
(b)
Weld two brackets 100 x 75 x 10mm once holed for 12mm diameter bolt
welded to base plate at a spacing of ± 80mm to house the 75 x 75 x
2mm R.H.S. (Rectangular Hollow Section) posts.
|
|
2. |
Posts: |
(a)
75 x 75 x 2mm x 2000mm high end capped at the bottom and holed for
one 12mm diameter bolt. Two (2 No.)
(b)
10mm thick M.S. (Mild Steel) plates 240 tapering to 80mm x 310mm
high twice holed for 12mm diameter bolts as per sketch welded to top
section of the posts to house the rafter. Eight posts shall house 8
No. lacing hooks welded/fixed per side on two sides, 2No. “U”
brackets each on top and bottom holed for to receive 6mm diameter
steel cable and M10 turnbuckle bracing. Four No. (4) “U” brackets (2
No. per side) welded on to gusset plates to hook 50 x 50 x 1.6mm
beams and “Hillaldam” rail or equivalent. |
|
3. |
Rafters: |
(a)
75 x 75 x 2mm R.H.S.
three times holed for 12mm diameter bolts on one half and 460mm 80 x
10mm thick M.S. plate bent to profile, twice holed for 12mm
diameter bolt and one side welded at apex to receive other half of
the rafter. The other half of the rafter (75 x 75 x 2mm) 5 times
holed for 12mm diameter bolt.
|
|
4. |
Collar: |
75 x 75 x 2mm R.H.S. collar cut to profile and welded at both ends
with 80 x 240 x 10mm M.S. plates twice holed for 12mm diameter
bolts. |
|
5. |
Beams: |
(a)
50 x 50 x 1.6mm R.H.S. ridge beam hooked to rafter at apex.
(b)
50 x 50 x 1.6mm R.H.S. side beam hooked to posts.
( c)“Hillaldam” or equivalent 2 No. rails hooked to posts to hang
side curtains on pulleys, minimum of 3 No. pulley per meter. |
|
6. |
Bracing: |
Bracing to end bays; roof and sided with 6mm diameter steel cables
fixed at ends with M10 turnbuckle and eye for tensioning and
hooked to brackets In rafters and posts respectively. |
|
7. |
Brackets: |
(a)
60 x 8mm “U” brackets bent to profile and welded to posts and
rafters to hook beams.
(b)
60 x 8mm “U”
brackets twice holed for and welded to posts and rafters to receive
6mm diameter steel bracing cables. |
|
8. |
Roof Covering: |
(a)
600g P.V.C. top with 4 Ton webbing in pockets at ± 3000mm centers
(over the rafters) for reinforcing to prevent damage and
withstand strong winds, with TG 7 eyelets and anchored to
posts on cleats with U.S.A. buckle and 12mm diameter ski rope.
(b)
Colour: Shell white with the letters M. O. E. T., indelibly
written on top as on drawing (colour: chocolate crème) |
|
9. |
Side Curtains: |
550g P.V.C. side curtains, permanent close on one side lengthwise
and the other side hung on “Hillaldam 200” or equivalent rails with
pulleys between posts with G4 eyelets on top and sides, sides fixed
lacing hooks welded to posts with ski-rope. |
|
10. |
Doors: |
1000 x 2000mm one on each gable side with heavy duty industrial zip
47mm wide to open. |
|
11. |
Windows: |
1200 x 1000mm with P.V.C. mesh (“Neucoat” product or equivalent) one
in each bay on either side with P.V.C. flaps and Velcro to open the
windows (8 No.). |
|
12. |
Bolts: |
All bolts shall be galvanized. |
|
13. |
Steel Frame: |
All steel components including all accessories to be galvanized. |
|
| |
|
Recent
News |
 |
14 April, 2012
Minister recognizes Herders for Good
Stewardship of Land and Natural Resources |
 |
22 March, 2012
Climate Change and Gender Workshop |
 |
13 March, 2012
Solar Home Systems in Lesotho |
 |
27 February, 2012
LREBRE looks back as it winds up its activities |
 |
13 December, 2011
International
Volunteer Day Celebrations - 2011 |
 |
12 December, 2011
Debate on Political
Tolerance Marks Human Rights Day |
 |
6 December, 2011
UNDP Supports Ministry
of Gender on Gender Sensitive Media Reporting |
 |
5 December, 2011
Commemoration of World
AIDS Day 2011 |
 |
28 November, 2011
Lesotho's Economy catches flu, writes Africa
Renewal Magazine |
 |
25 November, 2011
Strategic Planning for Parliament of Lesotho |
 |
25 November, 2011
SLM Model Developed in Lesotho |
 |
28 November, 2011
Lesotho's Economy catches flu, writes Africa
Renewal Magazine |
 |
12 November, 2011
Bridging the Gender
gap in Lesotho |
 |
28
October, 2011
UN Lesotho Celebrates UN Week 2011
|
 |
3 October,
2011
Workshop on National Human Rights Action Plan
|
|
Information |
|
|
|
UNDP in Lesotho |
|
|
|
Related
Sites |
|
|
| |
|
|