Technical Specifications for Free-Standing Portal Frame(Knock-Down)
 

 UNITED NATIONS DEVELOPMENT PROGRAMME LESOTHO

Technical Specifications

  Click here to get the list of the sites where the tents are going to be installed.

1.

Base Plate:

(a)    250 x 250 x 8mm thick four times holed for 12mm diameter bolts.

(b)   Weld two brackets 100 x 75 x 10mm once holed for 12mm diameter bolt welded to base plate at a spacing of ± 80mm to house the 75 x 75 x 2mm R.H.S. (Rectangular Hollow Section) posts.

 

2.

Posts:

(a)    75 x 75 x 2mm x 2000mm high end capped at the bottom and holed for one 12mm diameter bolt. Two (2 No.)

(b)   10mm thick M.S. (Mild Steel) plates 240 tapering to 80mm x 310mm high twice holed for 12mm diameter bolts as per sketch welded to top section of the posts to house the rafter. Eight posts shall house 8 No. lacing hooks welded/fixed per side on two sides, 2No. “U” brackets each on top and bottom holed for to receive 6mm diameter steel cable and M10 turnbuckle bracing. Four No. (4) “U” brackets (2 No. per side) welded on to gusset plates to hook 50 x 50 x 1.6mm beams and “Hillaldam” rail or equivalent.

3.

Rafters:

(a)  75 x 75 x 2mm R.H.S. three times holed for 12mm diameter bolts on one half and 460mm 80 x 10mm thick M.S.  plate bent to profile, twice holed for 12mm diameter bolt and one side welded at apex to receive other half of the rafter. The other half of the rafter (75 x 75 x 2mm) 5 times holed for 12mm diameter bolt.

4.

Collar:

75 x 75 x 2mm R.H.S. collar cut to profile and welded at both ends with 80 x 240 x 10mm M.S. plates twice holed for 12mm diameter bolts.

5.

Beams:

(a)    50 x 50 x 1.6mm R.H.S. ridge beam hooked to rafter at apex.

(b)   50 x 50 x 1.6mm R.H.S. side beam hooked to posts.

( c)“Hillaldam” or equivalent 2 No. rails hooked to posts to hang side curtains on pulleys, minimum of 3 No. pulley per meter.

6.

Bracing:

Bracing to end bays; roof and sided with 6mm diameter steel cables fixed    at ends with M10 turnbuckle and eye for tensioning and hooked to brackets In rafters and posts respectively.

7.

Brackets:

(a)    60 x 8mm “U” brackets bent to profile and welded to posts and rafters to hook beams.

(b)   60 x 8mm “U” brackets twice holed for and welded to posts and rafters to receive 6mm diameter steel bracing cables.

8.

Roof Covering:

(a)    600g P.V.C. top with 4 Ton webbing in pockets at ± 3000mm centers (over the rafters) for reinforcing to prevent damage and withstand strong winds, with TG 7 eyelets and anchored to posts on cleats with U.S.A. buckle and 12mm diameter ski rope.

(b)   Colour: Shell white with the letters M. O. E. T., indelibly written on top as on drawing (colour: chocolate crème)

9.

Side Curtains:

550g P.V.C. side curtains, permanent close on one side lengthwise and the other side hung on “Hillaldam 200” or equivalent rails with pulleys between posts with G4 eyelets on top and sides, sides fixed lacing hooks welded to posts with ski-rope.

10.

Doors:

1000 x 2000mm one on each gable side with heavy duty industrial zip 47mm wide to open.

11.

Windows:

1200 x 1000mm with P.V.C. mesh (“Neucoat” product or equivalent) one in each bay on either side with P.V.C. flaps and Velcro to open the windows (8 No.).

12.

Bolts:

All bolts shall be galvanized.

13.

Steel Frame:

All steel components including all accessories to be galvanized.

 
 Recent News

14 April, 2012

Minister recognizes Herders for Good Stewardship of Land and Natural Resources

22 March, 2012

Climate Change and Gender Workshop

13 March, 2012

Solar Home Systems in Lesotho

27 February, 2012

LREBRE looks back as it winds up its activities

13 December, 2011

International Volunteer Day Celebrations - 2011

12 December, 2011

Debate on Political Tolerance Marks Human Rights Day

6 December, 2011

UNDP Supports Ministry of Gender on Gender Sensitive Media Reporting

5 December, 2011

Commemoration of World AIDS Day 2011

28 November, 2011

Lesotho's Economy catches flu, writes Africa Renewal Magazine

25 November, 2011

Strategic Planning for Parliament of Lesotho

25 November, 2011

SLM Model Developed in Lesotho

28 November, 2011

Lesotho's Economy catches flu, writes Africa Renewal Magazine

12 November, 2011

Bridging the Gender gap in Lesotho

28 October, 2011

UN Lesotho Celebrates UN Week 2011

3 October, 2011

Workshop on National Human Rights Action Plan

 Information
Jobs/Bids
Contact Us
 UNDP in Lesotho
About UNDP Lesotho
Who is who
UN Coordination
Partner information
Resident Coordinator's Annual Report
Revised UNDAF for Lesotho
UNDAF Action Plan for Lesotho
UNDAF 2010 Annual Work Plan for Lesotho
UN Lesotho One Fund
Country Programme Document
Country Programme Action Plan
Information about Lesotho
 Related Sites
UNDP Global
Country Offices Websites
UN Lesotho
UNV Programme
 
 
© United Nations Development Programme 2011  |  Contact Us  |  Work for UNDP